Station configuration checked before it reaches site.
For protection, substation automation and commissioning engineers. Your relay vendor tools stay as they are.
- Standards
- IEC 61850 · IEC 62443
- Station files
- SSD, ICD, IID, SCD, CID, SED
- Records
- COMTRADE 1991, 1999 and 2013
- Works with
- SCL from PCM600, System Configurator and other IEC 61850 tools
- Deployment
- Self-hosted, your cloud or air-gapped
What your team gets
IEC 61850 engineering without leaving the IDE.
Govern features are in use today. Domain modules are pre-release; their state is listed under Tools and formats.
Who uses it
One environment for every role on the team.
Tools and formats
What the Energy module handles, and how far each is verified.
The module is behind a setting, off by default. Loading a CID file to a relay goes through the relay vendor's tool.
No relay vendor tool or relay has been run, and no customer project opened. The module's checks are its own, not a vendor tool's acceptance. Domain modules are pre-release. Nothing is verified by a customer yet, and nothing is verified on Windows. Do not rely on a capability for production work until it is verified for your tools, versions and operating system. Product names belong to their owners.
How a change moves
A person decides before anything leaves the desk.
- ProposeAn engineer or agent drafts a change to station configuration.
- VerifySchema and consistency checks run on the files before issue.
- ApproveA push to the issued configuration waits for a named approver.
- RecordChange, results and approval kept together in the audit record.
Standards
Evidence for your engineering process. Conformance is yours.
Neural Inverse provides evidence toward these standards. Certification stays with your organisation and assessor.
Products used
Product names belong to their owners.

Talk to our team.
Neural Inverse is available by request. We work with your engineering, security and procurement teams from the first conversation.